This was a building that Moyne were already very familiar with having recently completed electrical design and installation for levels 1 & 2 of the same building.
The environment generally had the M&E services existing, extending from the base build connection points. However additional plant was required to be installed under the fit-out to serve the Communications rooms located on level 8 and 9. This was supplemented with a new CAT B Lighting system being introduced and integrated onto the existing building wide KNX control system via dali gateways. In addition, underfloor power was supplied via 63a bus-bar and associated tap off units throughout the floor complete with under-desk grommets.