This prestigious London based office location required a complete re-configuration of the BNO power infrastructure. The first stage involved stripping back the 200Kva 300mm 4core SWA and relocating the entire unit to a new location. This was then supplemented with the installation of:
- New 200Kva, supplies installed to the ground floor new retail unit
- New 240mm 4core SWAs through the existing fabric of the building and existing plant rooms
- Re-use of the existing 400 amp MCCVs with additional digital energy metering added
The final stage involved connecting and configuring the metering to the existing building energy metering system.
“It was great to work with Moyne again on this re-configuration. We have always appreciated their knowledge and expertise when working on important projects like this, as we know they will pull out all the stops to get the project done, without compromising on the electrical installation.”
GPF Lewis