The complete refurbishment of this stylish office environment working with Epiphany was spread over three floors. The level of finish for level 14 was to CAT A+, while levels 13 and level 15 were to CAT A. The critical elements of the electrical installation comprised o the following aspects:
- Installation of low level power including cleaners sockets and floor boxes
- Adaption of the existing fire alarm and PAVA installation
- Adaption to the mains distribution systems
- Power supplies to mechanical plant
- Lighting installation including feature pendants to break out zone and general office luminaires
- Adaption of the existing addressable lighting control system
- Testing and commissioning
“This refurbishment was working to tight deadlines with a view to completing the entire work within three months. Regular project review meetings with Moyne through-out addressed any arising issues rapidly and kept the entire installation on track for completion within the timescale.”
Darren Furlong, Director, Epiphany