Mark Lane Offices, London

Mark Lane Offices, London

The works on this prestigious office environment involved the refurbishment of three office floors to a CAT A and CAT A+ standard.

The complete refurbishment of this stylish office environment working with Epiphany was spread over three floors. The level of finish for level 14 was to CAT A+, while levels 13 and level 15 were to CAT A. The critical elements of the electrical installation comprised o the following aspects:

  • Installation of low level power including cleaners sockets and floor boxes
  • Adaption of the existing fire alarm and PAVA installation
  • Adaption to the mains distribution systems
  • Power supplies to mechanical plant
  • Lighting installation including feature pendants to break out zone and general office luminaires
  • Adaption of the existing addressable lighting control system
  • Testing and commissioning

“This refurbishment was working to tight deadlines with a view to completing the entire work within three months. Regular project review meetings with Moyne through-out addressed any arising issues rapidly and kept the entire installation on track for completion within the timescale.”

Darren Furlong, Director, Epiphany

PROJECT VALUE:

£140k

CONTRACT RUNNING TIME:

12 weeks
Mark Lane Offices

BROWSE MORE MOYNE LONDON PROJECTS

QUICK ENQUIRY

CONTACT US

Moyne London Ltd
Unit 8, 21 Wadsworth Road
Perivale, London
UB67LQ

020 8998 2084

© Moyne London Ltd 2020. ALL RIGHTS RESERVED   |   Privacy Policy   |   Cookie Policy   |   Website Developed by Oxfinder  

Scroll to Top