Live Nation, London

Live Nation, London

The Farmiloe Building is a Grade II listed building, dating from 1868 and working with BW required a CAT A installation and CAT B install.

This Victorian warehouse underwent a massive transition to become the headquarters for Live Nation. Spread over 63,000 square feet near Farringdon station the project was designed to reflect the environment. This involved the design and installation of exposed electrical systems in order to produce contemporary high specification loft style office accommodation to reflect the Live Nation brand. Works included:

  • Alterations to existing services (CAT A was part completed by others)
  • Electrical services design and installation
  • Bespoke lighting design and luminaire adaptions
  • Installation of all primary and secondary containment and power supplies for specialist contractors install (specialist contractors not part of the Moyne Package)

PROJECT VALUE:

£1.19 million

CONTRACT RUNNING TIME:

34 weeks
Live Nation
Scroll to Top